We moved last Friday and that went well, we are just about done with all of the extra stuff like curtain rods, and shelves, and everything was in place in every room but the sewing room .
Then about 6 PM water started pouring out of our bathroom ceiling and it was a 1/2 hour before someone responded to shut off the water. the ceilings are wet in one end of our bedroom and my sewing room. The hallway ceiling is a mess and bathroom ceiling of course is a mess and will probably have to come down. A cleaning service came to suck up the water and set up a fan to dry out the carpet which will probably be replaced. I called our son to come and help us and we got Jack's computer amd the TV out of the bedrrom.
At this point it is almost too much for us and I am not even going to think about who is going to move all the furniture out of the two bedrooms so they can do whatever. It will NOT be us.
I have been working on a post with our Diva Challenge pictures but Blogger is not working well and I am out of patience and out steam. The pics will wait.
No comments:
Post a Comment